Carefully We Roll Along

Print More

PavingCreeping slowly clockwise around Quail Run Road, the Galasso crew lay down the first coat of new pavement on the milled surface as a roller follows closely behind. A long queue of dump trucks kept the paving machine supplied with hot asphalt mix. Town Engineer Gerry Turbet commented that about 14 miles of Suffield town roads are expected to be resurfaced this season, the most ever.

Comments are closed.