Brewery Site Excavated

Print More

Photo by Lester Smith

In mid-September, Darren Moran in the back hoe dumps another shovel of crushed rock for Eamon Moran of Moran Excavating to spread with his bulldozer, preparing the ground floor base for the Broad Brook Brewery. The graded site in Mach One Industrial Park on South Street will have a viewing balcony on the upper level by the brew pub and office, looking down onto the fermenting vats in the high bay below. The building in the background is Kelly Freezer.

Comments are closed.